23 March 2010

Goulburn Tuesday

As I was leaving Goulburn yard, I was stopped at the level crossing with NY3 passing. It slowed right down for a possible crew change, so a quick dart around the back way to Mundy St bridge for a few wagon shots.


An RQIY with steel rod loading onto a pair of stacked flat rack containers.


RKRF 3262 headed back to Whyalla for more 27m lengths of rail. This paired railset had problem delivered rail to Acacia Ridge where it is transloaded onto QR narrow gauge wagons.

Enjoy



No comments:

Post a Comment