17 March 2024

AusTube Mills (ATMU) returning empty...

After posting a few weeks ago about the new AusTube Mills flatracks (42PJ model) and their various loading, I managed to get some shots the other day of them returning empty to Newcastle and Brisbane.

They are loaded in stacks three high, with 12 x 5000kg and 2500kg Silverback straps tying the top two down to the base flat.  It doesn't seem to matter if they are loaded front or rear in their stacking.

The middle posts are also lowered.  Pretty neat stacking.

Enjoy! 








.


No comments:

Post a Comment